green mamba
Page 2 of 5 • Share •
Page 2 of 5 •
1, 2, 3, 4, 5 
green mamba
16 + suspension dents= band aid plasters in need

ototw- Posts: 1763
Join date: 2008-10-12
Age: 45
Re: green mamba
sounds cool, that could be hard to put on though. 

_________________
Controlling The Uncontrollable



dt_insane- Posts: 2352
Join date: 2008-10-06
Age: 23
Location: PE

Re: green mamba
cant wait to see the results
Raymond- Posts: 2513
Join date: 2008-08-19
Location: Port Elizabeth

green mamba
and eight days later the green mamba has fallen,it had its final prang today,It need a kg of plaster of paris or china or taiwan,but the nose aint alive..................................... .
my next car must be a beetle,
my next car must be a beetle,

ototw- Posts: 1763
Join date: 2008-10-12
Age: 45
midnight pumpkin body
Eich bud, the green mamba didnt last long hey? Maybe you should get a 'midnight pumpkin' body. I think it is similar to the old American pick ups, with the bulging rear fenders. Has someone got a pic of this, otherwise google it. Its a tamiya kit. Maybe this will help until the driving improves
we all battled at first so dont give up. It really does get easier after lots of practise. Enjoy the learning curve, GB
slidewayz- Posts: 281
Join date: 2008-08-27
Location: East London
Re: green mamba
Ototw stands on the ground while racing because the stand's staircase is not yet on. Trust me, it is very difficult not to drive into the pipes from down there. I tried with Shameless s/stock car and drove into the pipes far to often, giving up after 2 laps not to destroy his pimped ta05.
Since the new track is the property of all the member's, we will attempt to make it as user friendly as possible. The pipes were removed yesterday and replaced with very mild curbs. Again thanks to all who helped and for Shameless who sponsored the cement for the project. Thanks Kurt for helping again, you also made your mark at the new track. Deon, I spoke to you earlier and we were both sore. Thinus has been very quiet 2day, I think he is resting well after the concrete mixing. Thanks again guys. The 18th of Jan is around the corner and we are well on our way.
Since the new track is the property of all the member's, we will attempt to make it as user friendly as possible. The pipes were removed yesterday and replaced with very mild curbs. Again thanks to all who helped and for Shameless who sponsored the cement for the project. Thanks Kurt for helping again, you also made your mark at the new track. Deon, I spoke to you earlier and we were both sore. Thinus has been very quiet 2day, I think he is resting well after the concrete mixing. Thanks again guys. The 18th of Jan is around the corner and we are well on our way.
Raymond- Posts: 2513
Join date: 2008-08-19
Location: Port Elizabeth

Page 2 of 5 •
1, 2, 3, 4, 5 
Permissions of this forum:
You can reply to topics in this forum



